How to lay a paver patio, step by step

A paver patio is one of the most achievable hardscape projects for a homeowner, but it rewards patience at the boring stages. Most of the work, and most of the long-term quality, happens before the first paver goes down. This guide walks through the whole job in order.

At a glance

  • Time: a 150–200 ft² patio is commonly a two- to three-weekend job for two people, with digging and base work taking most of it.
  • Hardest part: excavation and moving material. A cubic yard of base weighs well over a ton.
  • Tools to rent: plate compactor; wet saw or masonry cut-off saw; possibly a sod cutter.

Before you start

  • Call before you dig. In the US, call 811 a few days ahead so buried utilities are marked. Other countries have similar services.
  • Check local rules. Some towns, HOAs or water authorities regulate hard surfaces, especially near property lines.
  • Read the paver manufacturer's installation guide. It may specify base and bedding materials for its warranty.
  • Plan your material list with the patio paver planner so everything can be delivered before you start.

Tools and materials

What you will typically need
ToolsMaterials
Stakes, string line, line level, tape measurePavers (plus waste allowance)
Spade, flat shovel, wheelbarrow, rakeCrushed gravel base
Plate compactor (rent)Bedding sand or fine chip
Two 1 in pipes and a straight screed boardEdge restraint and spikes
Rubber mallet, 4 ft levelJoint sand (regular or polymeric)
Wet saw or cut-off saw, eye/ear/dust protectionGeotextile fabric (clay or wet soil)

Step 1: Lay out the patio

Mark the outline with stakes and string, or with marking paint for curves. Extend the layout 6–12 in beyond the finished paver edge so the base supports the edge restraint. Check that a rectangular patio is square by measuring both diagonals; they should be equal.

Step 2: Set the finished height and slope

Decide where the finished surface will sit, usually a little below a door threshold and just above the lawn. Set a string line at that height along the high side, then drop it about ⅛–¼ in per foot toward the low side so water drains away from the house. Every later depth is measured down from this string.

Step 3: Excavate

Dig to paver thickness + 1 in of bedding + base depth below the string. See paver base depth for typical base depths by soil. Remove all sod and organic topsoil. Keep the bottom of the excavation parallel to the finished slope.

Compact the soil at the bottom with the plate compactor. If you hit soft spots, dig them out and fill with base material.

Step 4: Install fabric (if needed)

On clay, silty or wet soils, roll out geotextile fabric across the excavation, overlapping seams generously, and run it up the sides a little.

Step 5: Build the base in lifts

Spread 2–4 in of crushed base, rake it level, dampen it lightly if it is dry, and compact it with several passes of the plate compactor. Repeat until you reach the full depth. Check the height against your string as you go. The finished base should match the slope of the patio and be within about ¼ in of flat under a 10 ft straightedge.

Take your time here. Problems in the base show through every layer above it, and they cannot be fixed later without lifting pavers.

Step 6: Screed the bedding layer

Lay two 1 in pipes on the base, parallel, a few feet apart. Pour bedding sand between them and pull a straight board across the pipes to strike off a perfectly even 1 in layer. Remove the pipes, fill the grooves with sand and trowel them smooth. Work in sections and do not walk on screeded sand.

Step 7: Lay the pavers

Start at a straight, fixed edge, ideally a house wall or a string line, and place pavers straight down onto the sand. Do not slide them; it ruins the screeded surface. Keep the joint spacing consistent; many pavers have built-in spacer nubs. Pull pavers from several pallets as you go so color variation is blended.

Check alignment with a string line every few rows. Small drifts add up quickly across a patio.

Step 8: Cut the edge pieces

Lay full pavers over the whole area, then mark and cut the pieces along the edges and around obstacles. A wet saw gives clean cuts and controls dust. Avoid tiny slivers at the edge; it is better to cut two pavers a little smaller than to leave a piece only an inch wide.

Cutting concrete and stone creates silica dust, which is a health hazard. Cut wet where possible and wear a suitable respirator, eye and hearing protection.

Step 9: Install edge restraint

Fix edging tight against the outer pavers, spiked into the base below the bedding layer. The restraint keeps the field of pavers locked together.

Step 10: Compact and fill the joints

Sweep dry joint sand across the surface. Run the plate compactor over the pavers (with a protective pad if the manufacturer recommends it) to settle them into the bedding sand. Sweep in more sand and compact again until the joints are full.

If you use polymeric sand, follow the bag instructions exactly: the surface must be completely dry when you sweep it in, all residue must be blown off the paver faces, and it is then wetted to activate. Mistakes here leave a hazy film that is hard to remove.

Common mistakes to avoid

  1. Not removing all topsoil and sod before building the base.
  2. Compacting the base in one thick layer.
  3. Using extra bedding sand to hide dips in the base.
  4. Laying pavers before checking slope and square.
  5. Skipping edge restraint on "just one side".
  6. Ordering pavers without a waste allowance, then getting a different batch color later.

Frequently asked questions

How long until I can use the patio?

Regular joint sand: immediately. Polymeric sand: wait as long as the bag says, often a day for foot traffic.

Can I lay pavers over existing concrete?

Sometimes, if the slab is sound and drains, using a method recommended by the paver manufacturer. Cracked or heaving slabs should be removed.

How many extra pavers should I buy?

Usually 5–10%, more for diagonal patterns, curves and many cuts. See how many pavers you need.

Use the patio paver planner to get pavers, base, bedding sand, edging and joint sand on one printable list before you start digging.

Sources and further reading

The ranges in this guide summarize published guidance like the sources above. Always follow the instructions for your specific product and any local rules.